top of page

Project Info

Client

Watpac Ramelius Resources

Location

Mount Magnet WA

Duration

40 Weeks

Mount Magnet Heavy Vehicles Workshops

Overview

 

Mining Operation Heavy Vehicle Workshops, Administration Buildings, Fuel Farm and Waste

 

 

Oil Management, Electrical and Data Systems.

Scope

  • Design and construction of the electrical, lighting, power distribution, switchboards      communications and data systems to these non process site facilities

  • Heavy vehicle workshops fixed machinery, power and lighting electrical

  • Underground LV & HV Power distribution

  • Switchboards, cabling, cable ladders and supports

  • Welding bays

  • Administration buildings

  • Wash down and apron work areas, pole lighting and power distribution

  • Fuel farm and oily water separation systems

  • Communications and data

  • Commissioning & testing

  • Design drawings & Engineering certification

Challenges

Hender Lee Electrical provided logistics and manning resources to meet the clients     requirements and the remote site constraints. 

bottom of page