Bentley Department of Health Service - HV Switchroom Upgrade

01
Project Description:
The Department of East Metropolitan Health with ETC Consultants s engaged Hender Lee from July 26 for the full construction of a new substation building construction including landscaping, new earthing systems, new HV Switches and new required HV cabling, Earthing Rods and systems, connection to the existing Western Power existing substation to the Western Power network including all interface with Western Power custom scope works, HV Submissions with testing engineering certification and commissioning.
02
Scope of Work (but not limited to):
Building Permits, Design and certification
High voltage power installation including:
Western Power design interface
Western HV submissions and High Voltage system certification.
Earthing design and compliance certification
HV Switchgear
HV cable Terminations
HV earthing.
Low voltage power distribution installation including:
Switchboards
Power distribution submain cables
General power outlets.
Sub-circuit cabling
Cable pathways including cable ladders, trays, and conduits.
Earthing
Other miscellaneous services including:
General fittings and accessories
Artificial lighting including:
General lighting
Exit signs and emergency lighting throughout.
Emergency lighting testing system.


03
Challenges
HLE provided adjustments to existing in ground pits and conduits to suit new and adjusted ground levels.
We utilised materials and construction methods that were suitable against vandalism.
We installed numerous backup generators to maintain power throughout the park.
Coordination with different interests of stakeholders.
Extensive excavations and directional drilling was required through existing services.
HLE provided isolations and testing on some of the most critical HV feeder breakers.
04
Reference
Sadie Diggins
Senior Project Manager | Infrastructure and Facilities Management
East Metropolitan Health Service
Level 3, D block, Wellington Street, Perth WA 6000
M: 0412 126 092