Project Info

Client

Department of East Metropolitan Health

ETC Consultants

Location

New Bentley Hospital Site Western Australia

Duration

July 26-Mar 27

Overview

​

The Department of East Metropolitan Health with ETC Consultants engaged Hender Lee from July 26 for the full construction of a new substation building including landscaping, new earthing systems, new HV Switches, Sub Station Equipment with new HV cabling, Earthing Rods and Systems, Connection to the existing Western Power Substation and network including all interface with Western Power, HV Submissions,Testing engineering certification and commissioning.

​

Scope

​

Building Permits, Design and certification

High voltage power installation including

Western Power design interface

Western HV submissions and High Voltage system certification.

Earthing design and compliance certification

HV Switchgear

HV cable Terminations

HV earthing.

Low voltage power distribution installation including:

Switchboards

Power distribution submain cables

General power outlets.

Sub-circuit cabling

Cable pathways including cable ladders, trays, and conduits.

 Earthing

 Other miscellaneous services including:

General fittings and accessories

Artificial lighting including:

General lighting

Exit signs and emergency lighting throughout.

Emergency lighting testing system.

​

Challenges

​

HLE provided adjustments to existing in ground pits and conduits to suit new and adjusted ground levels.

We utilised materials and construction methods that were suitable against vandalism.

Coordination with different interests of stakeholders.

Extensive excavations and Earth Rod drilling 

Working and testing around existing under and above ground assets

​