Project Info

Client

Osmoflo / Synergy

Location

Cockburn Power Station Naval Base

Duration

Estimate October 2020 - April 2021

Synergy Power Station Water Treatment Plant Electrical Controls and Instrumentation

Overview

In July 2020, Osmoflo (www.osmoflo.com), awarded the Electrical and Instrumentation works for the supply of a Water Treatment Plant and Ancillary Equipment, that is required to receive bore and recycled site water, and supply the Cockburn Power Station and Kwinana Gas Turbines with treated water.  Synergy is Western Australia’s largest electricity generator and retailer of gas and electricity with more than one million residential, business and industry customers.

Scope

This SOW includes:

  • Site Installation, testing, commissioning & pre-commissioning checks, material, equipment, scaffolding and supervision.

  • Equipment installations, MCC switchboards,  A/C distribution boards, UPS, battery banks, instruments, power distribution boards, VSD’s within the MCC, air-conditioning systems, GPO’s and isolators within the plant area.

  • Stainless steel cable supports, stainless steel cable ladders, trays and conduits.

  • Lighting, chemical dosing panels, EDI rectifier panels, control equipment installation works, PLC cabinets, the Installation of  transmitters, arc flash labeling, instrument JB’s, RIO panels including instrument earthing.

  • Cable laying and termination, the supply and installation of  power cables to the WTP, instrument cables, fibre optic cables, control cables and communications cabling.

  • Earthing at the bus of Synergy’s upstream earth system.

  • Pre-commissioning and commissioning.

Challenges

Extensive works are required within a congested Process Equipment Building.  Hender Lee will be delivering the works within tight time frame allocations to suit our clients' mechanical and structural installation schedule.